Open Closing in a 24 days

River Colne Constructed Wetland Outline Design and Feasibility

Descriptions

This tender will encompass the following activities.

1. Topographical, hydrological, sediment and water quality surveys to understand the through-flow regime, likely input quality and quantities for a range of surface water run-off conditions.

2. Strategic investigation of on-site ground contamination and suitability of existing sediments for re-use or to allow identification of requirements for disposal (including Water Regulations (WR), Waste Management (WM3), and Waste Acceptance Criteria (WAC) as needed).

3. Biodiversity Net Gain assessment and Preliminary Ecological Appraisal highlighting lessons learned from the historic wetland design where evidence exists.

4. A multi-criteria options appraisal matrix to record and assess relative costs and benefits of a variety of sub-options and approaches to determine an evidenced preferred option.

5. Lead a stakeholder workshop and consultation exercise.

6. Provide appropriate information design to support discussions with stakeholders including reference to options for sediment movement volumes, space for sediment drying / processing area, gravel quantities / sourcing, water volume and retention requirements for functional filtration and water quality improvements, options for widening boundary onto playing fields if needed, etc re design and permitting constraints.

7. Develop the preferred option into a more formalised and feasible outline design that can be used in wider consultation and in early permitting discussions to enable an iterative design process and clearly specifies the required detail going forwards.

8. Identify the requirements for gaining consents.

9. Create / initialise necessary documentary evidence and applications for consents to build, using approved outline designs.

10. Attend regular meetings with the project manager and external stakeholders (as agreed) to inform design process. See detail in section 4.

11. Include detail of the likely management and maintenance requirements post construction to ensure sustainability and longevity of the constructed wetland. To include description, scale and optimal frequency of necessary ongoing maintenance activities where relevant.

For more information about this opportunity, please visit the Delta eSourcing portal at:

https://www.delta-esourcing.com/tenders/UK-UK-Watford:-River-regulation-and-flood-control-works./BQW35F353G

To respond to this opportunity, please click here:

https://www.delta-esourcing.com/respond/BQW35F353G

Timeline

Published Date :

18th Aug 2025 Yesterday

Deadline :

12th Sep 2025 in a 24 days

Contract Start :

5th Oct 2025

Contract End :

20th Mar 2026

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors