Closed
River Colne Constructed Wetland Outline Design and Feasibility
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
This tender will encompass the following activities.
1. Topographical, hydrological, sediment and water quality surveys to understand the through-flow regime, likely input quality and quantities for a range of surface water run-off conditions.
2. Strategic investigation of on-site ground contamination and suitability of existing sediments for re-use or to allow identification of requirements for disposal (including Water Regulations (WR), Waste Management (WM3), and Waste Acceptance Criteria (WAC) as needed).
3. Biodiversity Net Gain assessment and Preliminary Ecological Appraisal highlighting lessons learned from the historic wetland design where evidence exists.
4. A multi-criteria options appraisal matrix to record and assess relative costs and benefits of a variety of sub-options and approaches to determine an evidenced preferred option.
5. Lead a stakeholder workshop and consultation exercise.
6. Provide appropriate information design to support discussions with stakeholders including reference to options for sediment movement volumes, space for sediment drying / processing area, gravel quantities / sourcing, water volume and retention requirements for functional filtration and water quality improvements, options for widening boundary onto playing fields if needed, etc re design and permitting constraints.
7. Develop the preferred option into a more formalised and feasible outline design that can be used in wider consultation and in early permitting discussions to enable an iterative design process and clearly specifies the required detail going forwards.
8. Identify the requirements for gaining consents.
9. Create / initialise necessary documentary evidence and applications for consents to build, using approved outline designs.
10. Attend regular meetings with the project manager and external stakeholders (as agreed) to inform design process. See detail in section 4.
11. Include detail of the likely management and maintenance requirements post construction to ensure sustainability and longevity of the constructed wetland. To include description, scale and optimal frequency of necessary ongoing maintenance activities where relevant.
For more information about this opportunity, please visit the Delta eSourcing portal at:
To respond to this opportunity, please click here:
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45246000 - River regulation and flood control works
45246200 - Riverbank protection works
Keywords
river training
river regulation
bank revetment
viability study
channelization works
feasibility evaluation
slope stabilization
watercourse civil works
project due diligence
river edge consolidation
project assessment
riverbank stabilization
riprap installation
watercourse protection
feasibility analysis
bank reinforcement
advisory consultancy
erosion prevention
flood control works
economic analysis
riverbank protection works
technical feasibility study
project advisory services
flood mitigation infrastructure
water level control works
embankment toe protection
feasibility report preparation
hydraulic river engineering
vegetated bank structures
flood defence construction
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :