Awarded

ROW Winterhay Farm Footbridge, Ilminster (1825)

Descriptions

The footbridge currently present at this location is steel beamed with concrete block deck with timber handrails. In addition, a masonry abutment from a historic structure is present on the eastern bank. The footpath at this location is CH 14/11. These works are to include: • Provision of photographic condition survey of bridge area and proposed access routes. • Provision of current mid soffit height to invert. • Removal of existing abutments and reprofiling of southern bank to an approximately 45⁰ gradient. • Stabilise reprofiled surfaces of southern bank using natural materials (e.g., rock rolls below water level and biodegradable geotextile above). • Install new standard concrete pads. • Supply and install 1No. 15m span standard steel framed/timber clad footbridge. • Install steps either side of bridge with timber handrails. • Install gates at either end of bridge.

Timeline

Published Date :

22nd Aug 2024 6 months ago

Deadline :

22nd Jul 2024 7 months ago

Tender Awarded :

1 Supplier

Awarded date :

2nd Aug 2024

Contract Start :

14th Aug 2024

Contract End :

1st Nov 2024

CPV Codes

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors