Open Closing in a 1 month

Salmesbury Waste Water Pumping System Construction

Descriptions

The project is required to provide Foul Water Drainage as part of the ongoing development works at Samlesbury Enterprise Zone. The successful contractor will be required to provide final design for the system, construction of a new foul pumping station and approximately 2,750m of rising main.

 

Cundall (Engineering Consultancy) have undertaken the initial design for the foul water drainage system, and this has been approved by United Utilities. The final design and construction works will be carried out in accordance with all United Utilities standards therefore the successful contractor will be required to obtain all necessary approvals for the works from United Utilities, and this will be a requirement for practical completion.

 

The new foul pump station will be constructed on private land, which is adjacent to Sir Frederick Page Way, however the rising main will need to be constructed in the adopted highway. The successful contractor is responsible for traffic management and gaining all necessary consents from the Highway Authority in order construct the rising main.

 

The final connection into the United Utilities receptor will be across United Utilities land.

On completion, the successful contractor will also be required to provide planned maintenance for an initial period of 12 months. This period may be extended by instruction from the Project Manager.

 

The contract is anticipated to commence in June 2026 and the term of the contract will be 8 months, with an additional twelve months minimum maintenance period. This may be extended further if the system is not adopted by United Utilities in the first twelve months. United Utilities shall adopt the site when 50% of the site is occupied.

Timeline

Published Date :

4th Feb 2026 Today

Deadline :

13th Mar 2026 in a 1 month

Contract Start :

23rd Jun 2026

Contract End :

23rd Feb 2028

Tender Regions

CPV Codes

Keywords

waste fluid pump

on-site assembly

public works

building sites

structural work

renovation work

effluent pump

wastewater pump

site construction

drainage sewage pump

equipment alignment

infrastructure projects

sewage transfer pump

construction work

solids-handling pump

construction services

civil engineering

control panel setup

mechanical anchor setup

hardware commissioning

fixture installation

sewage dewatering pump

non-software integration

sanitary sewage pump

building construction

submersible sewage pump

sewage handling pump

structural bracket installation

piping system installation

lighting fixture mounting

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk