Awarded
STEP P&T – High Heat Flux Testing and Verification Facility
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
An integrated system that will provide cooling for the high heat flux testing for the STEP in-vessel components, as well as cooling the auxiliary systems required for operation, as part of the High Heat Flux Testing and Verification Facility. This system will include: Temperature Control Unit (226 kW cooling capacity, 150 kW heating capacity and a maximum operating temperature of 350°C) Chiller (350 kW cooling capacity) Design of the Temperature Control Unit and Chiller System, along with all necessary components for operation. Commissioning of the system. Installation of the system. This system is very similar to the operational HIVE test rig which has used this supplier for the last seven years and shares the same fundamental design concept, many similar components, the cooling system and operational principles. These specific nuances are currently only understood by ICS Cool Energy. This project is an extension of the organisation’s Induction-heating based HHF testing programme and there is a stakeholder requirement to ensure equipment is directly comparable, and compatible to the HIVE facility, including physical interfaces, control, and data acquisition (see approved TD-0012050-A: SHR-010, SHR-011, SHR-013). As a result another supplier would have to retrofit the HIVE test to match the proposed HHFTVF facility increasing the cost beyond what we have been quoted. The absence of this system poses a significant technical risk to the project, as it will result in certain key stakeholder requirements falling out of scope and lead to a diminished operational capability, such as the inability to accurately replicate the first wall environment as well as future use cases. (see approved TD-0012050-A: SHR-008, SHR-009, SHR-016) To view this notice, please click here: https://ukifs.delta-esourcing.com/delta/viewNotice.html?noticeId=997133124
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
73100000 - Research and experimental development services
45331230 - Installation work of cooling equipment
71321000 - Engineering design services for mechanical and electrical installations for buildings
50721000 - Commissioning of heating installations
51100000 - Installation services of electrical and mechanical equipment
42510000 - Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery
73430000 - Test and Evaluation
Keywords
motor install
burner tuning
cooling coil
condenser module
evaporator unit
product analysis
pump mounting
generator wiring
heat exchanger
HVAC equipment
field trials
stress testing
security system mount
prototype development
test plan execution
electrical panel mount
control panel fitting
system pressure testing
chiller system setup
test implementation
performance validation
results verification
safety interlock test
MEP design services
operational assessments
experimental studies
refrigerating system
HVAC system setup
energy systems design
scientific research
air conditioning unit
industrial chiller
heating zone activation
technology investigation
laboratory testing
discovery research
heat load balancing
M&E installation design
capability trials
switchgear commissioning
innovation modeling
HVAC design consultancy
air filter system
thermostat commissioning
design conformity checks
technical services layouts
commissioning report issuance
building engineering design
industrial cooling assembly
electrical design for buildings
cooling equipment installation
user evaluation protocols
mechanical & electrical planning
building services engineering
compressor foundation alignment
fuel efficiency validation
technical performance scoring
boiler startup calibration
cooling plant installation
system readiness evaluation
mechanical systems engineering
system documentation handover
ventilation and cooling machinery
refrigeration unit fitting
conveyor belt installation
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :