Awarded
Strathy Wood & LT229/230 Strathy South Grid Transformer
Descriptions
The Strathy Wood Windfarm Connection project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy Wood windfarm on the network. The proposed substation is to have a single 132/33kV 90 MVA transformer (GT1) bay established at the windfarm with associated switchgears. The Strathy South project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy South windfarm on the network. The proposed substation is to have a two 132/33kV 120 MVA transformer (GT1 & GT2) bays established at the windfarm with associated switchgears.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
Scotland
CPV Codes
45231400 - Construction work for electricity power lines
Keywords
electric power line installation
high-voltage line construction
overhead transmission line build
power grid erection
electrical distribution infrastructure
utility line installation
energy corridor build
electric conductor installation
overhead cable line work
power transmission structure
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors