Closed
Supply and Install Sports changing and storage building
Descriptions
The following building to be supplied and installed at the Kenwyn Hill Playing Field. 80 ft x 25ft Steel frames building to be divided into half, with Wooden clad sides 6 by 1 tantalised timber and Apex roof with 120mm insulated sheeting with skylights. Changing facilities One end for football changing facilities power floated concrete floor, left blank for future kitting out. With windows an 2 doors. Storage facilities Other half as storage space with tamped concrete floor. With enclosed sides and large door way 4.5 m high by 3.5 m wide, one end. And pedestrian side door.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45000000 - Construction work
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors