Closed
Tamar Road Bridge — Recoating Scheme.
Descriptions
The Tamar Bridge (opened in 1961) forms a vital link across the Tamar estuary between the town of Saltash in Cornwall and the city of Plymouth in Devon and is part of the A38 trunk road network. The crossing is jointly owned by Cornwall Council and Plymouth City Council (the Joint Councils) and operated on behalf of the two authorities by the Tamar Bridge and Torpoint Ferry Joint Committee (TBTF). Funding for the facility is principally provided through a toll charged in the eastbound direction (Saltash to Plymouth), 24 hours a day, 365 days a year. Approximately 16 000 000 vehicles cross the facility annually. In 1999 the bridge underwent a major strengthening and widening project which provided an additional traffic lane (north cantilever), a dedicated pedestrian/cycle path (south cantilever), elimination of a dangerous road junction, improved public transport priority and safer access for toll collectors and maintenance staff. The main deck carries three traffic lanes, which are operated in a tidal fashion to match the dominant traffic demand.The bridge is a conventional suspension bridge with symmetrical geometry, having a main span of 335 metres and side spans of 114 metres, and with anchorage and approach spans the overall length is 642 metres.The towers are constructed from reinforced concrete, and have a height of 73 metres with the deck suspended at half this height. The towers sit on caisson foundations founded on rock.The main suspension cables are 350 mm in diameter and each consists of 31 locked coil wire ropes, with vertical locked coil hangers at 9.1 metre centres. The main cables are splayed at the anchorages and anchored some 17 metres into rock.The suspended structure comprises a stiffening truss that is 5.5 metres deep and composed of welded box sections, and a lightweight steel orthotropic deck composed of 13 mm deck plate stiffened by ‘U’ shaped troughs 6 mm thick and 230 mm deep, spaced at approximately 600 mm centres.TBTF operate a robust inspection and maintenance regime in line with current standards which meet the requirements set out in the Department for Transport Design Manual for Road and Bridges (DMRB), Volume 3 and relevant sections contained therein.Following extensive investigations and the development of an appropriate re-coating strategy the Joint Councils wish to appoint a specialist contractor that possesses all of the necessary accreditations, as outlined under the section below, headed Additional Information, to re-coat the under carriageway bridge structure, in accordance with the preferred strategy.The Tenderer's attention is drawn specifically to the widespread and intermittent nature of the defects that will require re-coating under this contract.The intention is to let a two year contract commencing in late Spring 2015, with an option to extend by up to a further 2 years (1+1).Further general information on the Tamar Bridge service is available at www.tamarcrossings.org.uk
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45262100 - Scaffolding work
45442180 - Repainting work
45442200 - Application work of anti-corrosive coatings
45442000 - Application work of protective coatings
45442100 - Painting work
45262120 - Scaffolding erection work
45442190 - Paint-stripping work
45442120 - Painting and protective-coating work of structures
45442110 - Painting work of buildings
45442300 - Surface-protection work
45442121 - Painting work of structures
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors