Open in a 1 month
Terrazzo Flooring Replacement Design Services
Descriptions
This overall scheme will deliver a full replacement at Newcastle, York, Darlington (and subject to funding Doncaster) railway stations swapping the current Terrazzo tiles with suitable alternative, the preferred solution must deliver acceptable PTV values (slip resistance), must be easy to clean and maintain, must be in keeping with the historic nature of the buildings and must not be vulnerable to sweating or other climate related phenomenon. In addition, the scheme will also look at delivering a number of other minor improvements in parallel, such as additional duct routes, supply points and improved wayfinding. These items are not core scope and will be discussed during the next stage prior to completion of final design. This Contract needs to deliver levels of design detailed enough to progress the various consents along with constructability advice robust enough to provide better cost assurance and information as to engage the various stakeholders. 1. Design: 2. Surveys: 3. Constructability Report & Budget: 4. Management & meeting attendance: 5. Consents: 6. General Advice & Design Services: Further information is found within the ITT Document pack.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71310000 - Consultative engineering and construction services
71500000 - Construction-related services
79415200 - Design consultancy services
71320000 - Engineering design services
Tender Lot Details
1 Tender Lot
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors