Open Closing in a 1 month

Thermal Buffer Technology

Descriptions

The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. UKIFS is seeking experts to support the design and development of a thermal storage system that integrates with the STEP power cycle. While the power cycle is designed to efficiently integrate heat from the tokamak device during a high power steady state scenario, the power cycle and cooling systems must also be highly flexible to adapt to uncertain prototypic operations e.g. the systems must have the ability to switch on and off and ramp up and down at the start and end of operational periods. Significant thermal power will be generated from the tokamak device during the ‘rapid density rise phase’ of the reactor plasma ramp up, lasting a few minutes. This is an effective ramp of 2GWth generated from the tokamak during these few minutes. To manage this very immediate and sudden generation of heat from the tokamak, a minimum amount of thermal storage will be needed to increase the thermal inertia of the primary coolant loops, allowing the power cycle to ramp up to 100% load in a timely manner. Further, thermal storage may be needed to enable partial operation of the power cycle during the transition between the initial pre-heat to part load operational period. The thermal storage system will be expected to extract heat from a hot CO2 primary coolant during the ramp up phase and deliver heat back to the CO2 primary coolant (or to a separate secondary working fluid) during the ramp down phase. The proposed technical operating conditions of the thermal storage system and load requirements are: -CO2 primary coolant operating pressure: 50 to 150 bar. -CO2 primary coolant operating temperature: 550°C to 650°C. -Thermal duty in the region of 800MW. -Required energy storage of 150MWh. -Required fast ramping duration in a few minutes. Systems of interest & key words: -Thermal energy storage -Latent heat storage -Sensible heat storage -Thermochemical heat storage -Thermal battery -Molten salt storage systems -Molten salt heat exchangers/ steam generators -Phase change materials -Metallic phase change materials -Solid state energy storage -Packed bed storage -Concrete battery -Sand battery For more information about this opportunity, please visit the Delta eSourcing portal at: https://ukifs.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./ABT7JSP243 To respond to this opportunity, please click here: https://ukifs.delta-esourcing.com/respond/ABT7JSP243

Engagement

To participate in this exercise, please complete and submit Appendix 1: Questionnaire and return any documents via the Delta portal. We are conscious of your time (and grateful to you for taking the time to complete the questionnaire), therefore we suggest you limit your responses to a maximum of 5 pages. If there are any areas you would like to expand on, please add a note to the relevant section for future discussion. If you experience any difficulties with the portal, please contact the portal helpdesk helpdesk@delta-esourcing.com cc operationalprocurement.step@ukifs.uk Information obtained from responses to Appendix 1: Questionnaire will help UKIFS understand current market capabilities and may shape the scope, direction, and design of the future procurement activities. If you have any questions about this Preliminary Market Engagement, please contact UKIFS through the Delta portal. We are keen to engage with suppliers to assist with the questionnaire if needed, to ensure quality responses enabling us to shape the future requirement and procurement. Following the submission and review of questionnaires, UKIFS intends to run an online conference call meeting/seminar/Q&A. The closing date for the pre-market engagement is Friday 27th March 2026, 1 pm.

Timeline

Published Date :

27th Jan 2026 Today

Deadline :

27th Mar 2026 in a 1 month

Contract Start :

31st Mar 2029

Contract End :

31st Mar 2033

Keywords

plant technical design

plant equipment layout

power system design

factory plant design

switchgear engineering

plant system planning

renewable grid design

electrical grid planning

project design advisory

conceptual engineering

process plant design

manufacturing plant consultancy

electrical network consultancy

power system integration services

process engineering blueprint

engineering blueprint consultancy

multidisciplinary engineering planning

engineering drafting services

technical design solutions

industrial plant solutions

power infrastructure planning

engineering specification services

power distribution layout

technical design services

system design engineering

substation design engineering

engineering design consultancy

electrical utility design

industrial plant engineering

plant facility engineering

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

PIN

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk