Open Closing in a 4 months
Tower Bridge Fire Suppression - Contractor
Descriptions
The City of London Corporation intends to appoint a principal contractor to undertake comprehensive fire suppression system upgrades at Tower Bridge. The scope includes the removal of existing sprinkler systems and the installation of new fire suppression systems covering the North and South Towers, abutments, high-level walkways, engine rooms, and the shop. Additionally, the project involves replacing gas suppression systems in four machine rooms, integrating systems with the Building Management System (BMS), and upgrading boosted mains and domestic cold-water systems. Works will be carried out within a live, Grade I listed structure, requiring meticulous planning to minimise disruption and ensure compliance with heritage and safety regulations. This is not a call for competition and no tender documents are available at this time.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45343000 - Fire-prevention installation works
51700000 - Installation services of fire protection equipment
Keywords
fire door installation
smoke curtain fitting
fire suppression system
sprinkler unit setup
gas extinguishing system
emergency alarm setup
flame sensor mounting
fire safety device fitting
heat detector integration
fire control panel installation
fire prevention installation
flame barrier system setup
smoke detector installation
fire alarm system fitting
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :