Open Closing in a 9 days
Transport and installation of precast tunnel segments
Descriptions
The Wendover Green Tunnel consists of five pre-cast concrete segments but is intersected by two bridges negating the ability to place the tunnel sections by traditional crane.
An alternative solution anticipated using an SPMT (Self-Propelled Modular Transporter).
Product weights are dividing wall 43.6tonne, arch wall 37.5 tonne, arch roof 19tonne. The arch roof sections are lifted to approx. 12m high.
The tunnel segments have been procured and are delivered to site on trailers.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
60651400 - Heavy-lift ship services
42410000 - Lifting and handling equipment
42414310 - Mobile lifting frames
Keywords
cranes
forklifts
hoists
pallet jack
conveyor systems
mobile handler
dock loader
aerial lift
material sling
load handler
mobile lifting frame
lifting gantry
portable frame hoist
mobile scaffold lift
wheeled lifting frame
modular lift frame
temporary hoist frame
mobile rigging frame
transportable lifting structure
frame-based lift
heavy cargo vessel hire
oversized load ship operations
marine lifting ship service
heavy-lift maritime transport
deck cargo vessel charter
heavy-lift ship logistics
ocean heavy cargo shipping
marine lift vessel
shipboard crane service
heavy freight vessel hire
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors