Transport and installation of precast tunnel segments

Descriptions

The Wendover Green Tunnel consists of five pre-cast concrete segments but is intersected by two bridges negating the ability to place the tunnel sections by traditional crane.
An alternative solution anticipated using an SPMT (Self-Propelled Modular Transporter).

Product weights are dividing wall 43.6tonne, arch wall 37.5 tonne, arch roof 19tonne. The arch roof sections are lifted to approx. 12m high.
The tunnel segments have been procured and are delivered to site on trailers.

Timeline

Published Date :

8th Oct 2025 Today

Deadline :

17th Oct 2025 in a 9 days

Contract Start :

22nd Mar 2026

Contract End :

25th Sep 2026

Tender Regions

Keywords

cranes

forklifts

hoists

pallet jack

conveyor systems

mobile handler

dock loader

aerial lift

material sling

load handler

mobile lifting frame

lifting gantry

portable frame hoist

mobile scaffold lift

wheeled lifting frame

modular lift frame

temporary hoist frame

mobile rigging frame

transportable lifting structure

frame-based lift

heavy cargo vessel hire

oversized load ship operations

marine lifting ship service

heavy-lift maritime transport

deck cargo vessel charter

heavy-lift ship logistics

ocean heavy cargo shipping

marine lift vessel

shipboard crane service

heavy freight vessel hire

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

No

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors