Open Closing in 26 days
Walsall College Chillers Replacement Heating and Cooling Heat Pumps.
Request tender documents
Save your time. You just request and we will send you the available (ITT/RFP/RFQ/PQQ/SQ) documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The Chillers Replacement with Heating and Cooling Heat Pumps project proposes the replacement of three existing end-of-life chiller units at Wisemore Campus with modern integrated heat pump systems capable of providing both heating and cooling. The p ....see more
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
plant heating electrics
ventilation duct setup
heating circuit setup
heating system fit-out
chiller system setup
HVAC installation
thermal equipment wiring
HVAC electrical works
boiler system fit-out
heating control circuits
industrial cooling assembly
central-heating system installation
cooling equipment installation
electrical installation of heating systems
building heating electrics
radiator pipework assembly
building heating infrastructure
boiler electric installation
cooling plant installation
air-conditioning system installation
refrigeration unit fitting
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :
Procurement Contact
Name :
Phone :
Email :
Possible bidding competitors
Possible bidding competitors