Awarded
ABLE MARINE ENERGY PARK - MAIN QUAY WORKS
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The Contracting Entity has undertaken this procurement process to appoint a Principal Contractor to work with in order to deliver the design and construction of Able Marine Energy Park - Main Quay Works (the Works)., The Works have been procured on a Design and Construct basis utilising the FIDIC EPC & Turnkey Form of Contract with Particular Amendments to the standard clauses, a copy of which was included in the procurement documentation., The first stage of the procurement consisted of the following:, - Standard Qualification Instruction to Suppliers (SQIS) document; with, - Annexure A - Standard Selection Questionnaire (SSQ); and, - Annexure B - Draft Invitation to Negotiate(ITN)., The SSQ (Annexure A) was based upon the Crown Commercial Service standard template, and was marked by an assessment panel using the process detailed within the SQIS., 3 Suppliers were selected to proceed to the Tender stage and were issued with the full and final Invitation to Negotiate (ITN) document, a draft version of which was annexed to the SSQ for information and reference purposes., The Tender stage of procurement was a competitive procedure with negotiation with the Suppliers selected by the assessment panel and based upon the Suppliers SSQ response., All completed Tenders were to be submitted by the Tender Return Date stipulated in the procurement documents., The ITN was evaluated on the basis of a 60% Quality and 40% Price weighting., The appointed Preferred Contractor shall be responsible for the Design, Procurement, Delivery to Site, Off-Loading, Construction, Installation and Commissioning (including all testing) relating to his delivery of the Works.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71322000 - Engineering design services for the construction of civil engineering works
45240000 - Construction work for water projects
45241100 - Quay construction work
45252124 - Dredging and pumping works
Keywords
waterworks build
port quay works
sludge removal
quay build
civil engineering design
road and bridge design
canal construction
quay civil engineering
treatment plant dredging
berth quay civil works
dam and reservoir works
technical civil design
pipeline dredge and pump
quay construction
structural planning
waterworks design
ship mooring quay works
sediment suction works
freshwater engineering
quayside installation
waterfront quay building
public works engineering
dredging and pumping
infrastructure blueprint services
water reticulation civils
utility infrastructure planning
watercourse dredge services
construction engineering consultancy
hydraulic structure build
silt pumping infrastructure
civil project technical design
hydraulic civil engineering
marine water project works
dockside quay installation
water infrastructure construction
harbor berth construction
channel cleaning operations
irrigation infrastructure
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :