Closed
Ashford Weir Fish Passage Improvements
Descriptions
Fish passage improvements to a vertical faced weir: The construction of a notched pre-barrage downstream and perpendicular to the existing weir, the formation of a formal fish passage notch within the existing low-flow notch and local raising of the existing weir crest. The construction of a proprietary eel pass and the protection of adjoining riverbed and banks with stone pitching and rip-rap is also required. Full details are provided in the appended documents.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
Construction structures and materials
construction work
building construction
civil engineering
infrastructure projects
site construction
building sites
structural work
construction services
renovation work
public works
equipment repair service
preventive maintenance program
troubleshooting visit
onsite repair support
maintenance contract service
repair diagnostics
component replacement service
service schedule planning
emergency repair team
calibration service
architectural services
building engineering
technical design
construction consultancy
structural engineering
inspection services
surveying
planning consultancy
facility design
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors