Open Closing in a 21 days

Bird Deterrent Netting and Stainless Steel Balustrade Infill Panels C4 - KCSL

Descriptions

Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of various bird netting and stainless steel balustrade infill panels to satellite buildings around the station complex. Those buildings include the following: • East Vent 1 • East Vent 5 • North Portal • South Portal • Train crew and catering • West Core • West Vent 1 • West vent 2 • East Core • Stainless steel grade 316 (grade 1.4401) netting • The system shall include all fixings, straps, clips, springs and any other accessories required to install the netting to the primary or secondary structure to the required specification. The Works shall effectively and reliably keep the façade and roof areas free from: • Bird habitation • Bird perching • Bird fouling The Works shall comply fully with the requirements of: • The Department for Environment, Food and Rural Affairs (Defra). • The Royal Society for the Prevention of Cruelty to Animals (RSPCA). • The Royal Society for the Protection of Birds (RSPB). • The Wildlife and Countryside Act 1981. The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing (if req'd), manufacture and installation of bird deterrent systems • Must meet the requirements for durability set out within the specification. • Works include also mock ups, samples and quality benchmarks. The Subsubcontractor will be responsible for progressing the schedule and associated Stage 4 drawings through design for manufacture and installation of bird netting and design and supply of stainless steel balustrade infill panels. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements. The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the sub subcontract works and the provision of sufficient temporary protection of the finished systems were required. Roof covering 1600+ sqm. Construction is to be carried out over a 2 year period commencing in Q3 2026 and completing in Q3 2028. Multiple visits will be required over this period.

Timeline

Published Date :

12th Dec 2025 3 days ago

Deadline :

5th Jan 2026 in a 21 days

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

cordage products

assorted ropes

binding twine

utility netting

sling ropes

garden mesh

jute twine

cargo nets

polypropylene cord

rope slings

textile netting

cordage

rope

twine

netting

rope products

hemp cordage

utility nets

twisted twine

metal netting

wire mesh netting

galvanized netting

fencing mesh

screening netting

protective metal mesh

industrial netting

reinforcement mesh

architectural netting

metal grid

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

No

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors