Awarded
Bootle Kirkby Cable Civils & Installation
Descriptions
Replace 19.429km of 132kV pressurised oil filled cables with 132kV non-pressurised XLPE solid cables Replace 19.429km of underground pilot wire with fibre optic cables Supply and install all ducting for the 132kV non-pressurised XLPE solid cables and fibre optic cables Complete all civils work (excavation, backfilling and reinstatement) associated with the installation Complete a single lane width reinstatement the length of the cable route (section approx. 1.8km) on the East Lancs road (A580) following the cable installation (Section 58 requirement) Scope of this work is for the cable civils only however we are optioning the cable installation costs. Replace existing outdoor sealing end structures at Bootle, Fazakerley and Gillmoss grid substations The existing modern non-pressurised XLPE solid cable sections along the two circuits including the outdoor sealing ends structures will be retained and reused. Drain, cut and cap of redundant oil filled cables and drain all associated oil tanks
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45000000 - Construction work
Tender Lot Details
1 Tender Lot
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors