Brewery Turnback - ES6-8 Devegetation Works
Descriptions
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
Devegetation Scope of Work:
- remove the existing vegetation from the proposed footprint of construction work, including removal of invasive species - JKW.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45111213 - Site-clearance work
77211300 - Tree-clearing services
45111200 - Site preparation and clearance work
Keywords
site clearance
vegetation removal
land preparation
topsoil stripping
site cleanup
ground clearing
demolition clearance
surface preparation
vegetation clearing
site readiness
site-clearance work
debris removal
site cleaning
land clearing
construction site clearing
preparatory clearance
scrap clearing
waste site cleaning
area clearance
rubble removal
tree clearing services
forest land clearance
site preparation
underbrush removal
scrub clearance
area deforestation
land opening work
forestry clearing
logging clearance
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors