Brewery Turnback - ES6-8 OLE Infrastructure
Descriptions
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
OLE Infrastructure Scope of Work:
The supply, installation, testing, and commissioning of new OLE infrastructure on the UP/Down Rochdale Fast and the new Turnback between Dalton Street and Miles Platting Junction (a combination of STC, TTC, and portals).
New wiring on the UP/ Down Rochdale Fast and a new Turnback between Manchester Victoria and Miles Platting Junction. All associated OLE works to support the new infrastructure.
This includes all hand back deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45234116 - Track construction works
45234100 - Railway construction works
45234000 - Construction work for railways and cable transport systems
Keywords
railway construction
cable transport installation
rail & cable infrastructure
railroad works
funicular build
tramway installation
ski lift construction
chairlift systems
cable car works
transport engineering
railway build
railroad engineering
track laying
rail infrastructure works
trainline construction
rail civil works
track system installation
rail corridor construction
heavy rail works
rail groundwork
rail track construction
track laying works
rail sleeper and rail joint construction
track alignment
track ballast installation
rail line construction
rail track engineering
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors