Open
Chesterfield Canal Trust - Main Works Contractor
Descriptions
This Main Works package will restore around 350m of canal and associated works. In summary this will include the construction of canal channel, a lock, vehicle access bridge, the creation of Public Rights of Way (PROW) and the installation of a water supply pumping system. An overview of the works is listed below: Groundworks • Strip existing topsoil and stockpile • Installation of necessary temporary access roads and hardstanding areas to facilitate the proposed construction methodology • Implement agreed temporary protection measures to utilities • Excavation to formation levels • Testing of excavated materials as required by the remediation strategy • Stockpiling on site of suitable excavated material • Disposal off site of any materials deemed unsuitable • Installation of drainage • Placing excavated and imported materials to final profiles, including topsoil • Any other temporary works required to facilitate the proposed construction methodology, including the design of all such temporary works Canal • Construction of 350m of canal channel, including soft and hard edging • Install pumping system for water supply • Canal overflow Bellhouse Lane Bridge • Construction of new vehicular access bridge • Excavation to formation and construction of bridge foundations • Fabrication, delivery, assembly and installation of precast culvert • Formation of earth approach ramps • Road surfacing, vehicle restraint system and drainage to bridge • Surfacing and drainage to footpath approaches Lock • Construct new lock structure, including in-situ concrete, coping stones and brick facing • Manage installation of lock gates (via nominated supplier) Rights of Way • Constructing and / or maintaining temporary rights of way, including farm access • Construction, realignment or upgrade of 2.2km of footpaths • Removal of temporary footpaths and associated reinstatement • Installation only of new fingerboard signage for pedestrian routes Soft and Hard Landscaping Clay Relocation • Movement and placement of clay • Reworking of clay as per Earth Works Spec Report for clay liner CDM • Fulfilment of the Principal Contractor role as defined under CDM Regulations 2015 Site Visits A site familiarisation visit will be held WC 4 November 2024. Mid tender site visits will be held WC 25 November 2024.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45223500 - Reinforced-concrete structures
45112500 - Earthmoving work
42122130 - Water pumps
45233161 - Footpath construction work
45247110 - Canal construction
Keywords
water transfer pump
clean water pump
raw water pump
centrifugal water pump
groundwater pump
irrigation pump
utility water pump
industrial water mover
domestic water system
water handling unit
earthmoving work
bulk earthwork
soil shifting
terrain reshaping
land grading
mass excavation
earth relocation
site leveling
ground moving
soil relocation
reinforced concrete structure build
RC structure erection
concrete frame construction
reinforced concrete shell build
concrete superstructure work
RC skeleton erection
structural concrete build
concrete core construction
load-bearing concrete structure
RC building framework
footpath build
pedestrian walkway installation
sidewalk construction
pavement surfacing
pedestrian path erection
walkway paving works
walkway network development
public footpath construction
sidewalk slab installation
curb path build
canal construction
inland canal build
watercourse canal works
canal excavation
artificial water channel installation
navigation canal build
canal lining and earthworks
irrigation canal build
navigable canal works
canal civil engineering ([turn0search3]
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors