Design and Build Contractor for PSDS3b Decarbonisation Works at Cornerstone Arts Centre, Didcot, Oxfordshire
Descriptions
The Works for Option 1 will involve: Verification of RIBA 4 designs Removal of the gas-fired boilers and vessels and associated works in the internal plant room Installation of Air Source Heat Pumps (ASHP) and associated vessels and equipment to provide heating and Hot Water Services Removal and replacement of Air Handling Units and removal of the rooftop chiller Radiator replacements Installation of Solar PV All associated works and general building de-carbonisation measures Refer to the document pack for the full details. The Works for Option 2 will involve: Verification of RIBA 4 designs for Solar PV only Installation of Solar PV and associated works Refer to the document pack for the full details. If Option 1 is adopted, PSDS funding requires a 'whole building' approach to the decarbonisation measures identified for the M&E Services upgrade, including all reasonable steps to reduce heating demand and minimise the total building energy use.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45210000 - Building construction work
Keywords
building erection
structural construction
new buildings
superstructure
commercial building works
residential construction
masonry
architectural building
shell construction
general building
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors