Closed
Design and Supply of Carpets for SWRs 158 and 159 Rolling Stock
Descriptions
SWR require a supplier to design and manufacture carpet for their fleet of class 158 and 159 vehicles. Mandatory requirements to be considered for this project: • Previous proven experience on Rail vehicles. • Product Fire rated: EN455-45-HL3 • Ability to provide carpet as a seamless installation across vehicle width. • Cut pile carpet SWR have a preference for: • 80%Woven wool/20% Nylon mix • British wool or similar due to the proven hard wearing/durability properties.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
railway rolling stock
tramway rolling stock
locomotives
train coaches
freight wagons
passenger coaches
tram cars
rail vehicle parts
rolling stock components
rail transport vehicles
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors