Closed
Elizabeth Line Controlled Environment Door Inspections & Reactive Maintenance and Door Remedials
Descriptions
TfL requires inspection and reactive maintenance to:
Controlled Environment Door Inspections & Reactive Maintenance
Pressure Rated Doors
Cross Passage Doors
The cross-passage doors are complex electro-mechanical systems that can only be inspected and maintained by competent contractors. There is a statutory requirement to inspect these doors at 6 monthly intervals.
Door Remedials
Remedial works will be required to maintain the functionality, safety, and compliance of all doors, hatch systems and associated components. The competent supplier will be responsible for fault diagnosis, corrective maintenance, and repairs to address system failures, damage, and security concerns.
Engagement
Following the EME UK2 notice, an Expression of Interest form will be issued to guage the market's appetite to bid for this requirement. Bidders are advised that RISQS will be the medium that this opportunity will be conducted through. The relevant RISQS codes are : C.D.4.3 Specialist Doors & Windows - Maintain C.D.4.3 Specialist Doors & Windows - Install
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
HVAC blower maintenance
genset diagnostics
cable tray service
fan coil unit tune-up
pump motor overhaul
switchgear calibration
motorized door repair
lift control panel fix
emergency lighting inspection
mechanical damper servicing
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :