Open Closing in a 5 days

HRB Structural Steelwork

Descriptions

The Hampstead Road Bridge is a 5-span, 8 steel girder structure with a composite concrete deck, spanning over the proposed HS2 railway lines. The bridge is approximately 140m long, extending from the existing Network Rail overbridge in the north to Cartmel House in the south.

The Subcontractor will be responsible for the design, installation and removal of any temporary works associated with the erection of the bridge deck, including assessments of temporary stability during erection process prior to completion. Any temporary work designs will need to be approved by the Contractor.

The bridge deck install will occur over 2 visits, which will be assumed core hours only. Visit number 1 will be to install the northbound carriageway steelwork and visit 2, will be to complete the southbound carriageway.

Timeline

Published Date :

17th Sep 2025 Today

Deadline :

22nd Sep 2025 in a 5 days

Contract Start :

29th May 2026

Contract End :

25th Sep 2026

Keywords

structures of bridges

bridge frameworks

bridge superstructures

bridge structural systems

bridge decks

bridge and tunnel construction

shaft erection work

subway build

overhead and underground crossing construction

viaduct and underpass building

substructure works

civil crossing facilities

transportation passage construction

tunneling and bridging build

urban transit structure

bridge construction

civil bridge building

structural crossing infrastructure

river span build

overpass erection

transport bridge construction

civil engineering bridge

vehicular span build

bridge superstructure work

crossing infrastructure

bridge building

structural bridge erection

span structure construction

transport overpass build

civil bridge projects

superstructure erection

crossing infrastructure build

bridge erection work

highway bridge building

bridgework services

railway bridge construction

train overpass erection

rail span build

railroad crossing structure

rail track bridge build

rail superstructure construction

metro bridge erection

rail corridor span build

rail transport bridge

track support bridge

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Name :

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors