Closed
HS2 - Westgate LV Switchgear (Sub-subcontract Package) copy
Descriptions
PHOENIX ME LIMITED have been successful in securing Westgate MEPH Design & Build part of the Stage Two of the HS2 MWCC for the S1 and S2 sectors with SCS JV (Skanska Construction UK Limited, Costain Limited, STRABAG AG - UK Branch). Stage Two is the detailed design and construction phase of the project. PHOENIX ME LIMITED invites you to submit your tender for providing the Design, Supply, delivery & Commissioning of the Switch Panels, Panel-boards, Metering, PFC package including, Training, O&M's & IST, FAT, SAT & attendance as necessary, as detailed in the Sub-subcontract, in accordance with the Invitation to Tender Enquiry and the documentation appended therein. These works are expected to be delivered in Two Stages, whilst being administered using the NEC3: Engineering and Construction Contract (ECC). Works Stages: Stage One - Design and Preconstruction Activities Stage Two - Manufacturing, Installation and Testing & Commissioning (Including all handover Documentations).
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
22314000 - Designs
71320000 - Engineering design services
Keywords
graphic designs
print layouts
template artwork
digital design prints
printed design services
engineering design consultancy
technical design services
multidisciplinary engineering planning
engineering specification services
system design engineering
engineering blueprint consultancy
project design advisory
engineering drafting services
conceptual engineering
technical design solutions
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors