Closed
HS2 - Westgate Sump Pumps(Sub-subcontract Package)
Descriptions
To install a complete and compliant Public Health installation to the project specifications including (but not limited to) the following: •Design, Supply and installation of the two pump sets at Westgate, the Sump Pump (FSP-01) and Retention Tank Pump Set (RTP-01) •All pipework inside the sump and up to the header including all valves on the header, as shown in demarcation sketch. •3D drawings to be produced for the inclusion in Phoenix BIM Model showing all devices and guide rails. •All pump guides inside sump or retention tank •Control panels for pumps •Control devices, both analogue and digital. •Commissioning of pumps with a full FAT and SAT •Wiring of control devices between device and control panel •All pumped drainage pipework shown on the 2D drawings from the pump to the header. •All support systems and fixings required to support the pipework in the sump and tank areas •All support systems and fixings required to support the pipework. Supports shall be installed to correct spacings or less, as determined by the pipework calculations. •All Unistrut, drops rods and other materials required to construct brackets and supports are required to be installed to the approved MCR. •Installation check sheets shall be completed by the sub-subcontractor. •Demonstration to Phoenix and client on how the pumps are removed for maintenance.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
42122000 - Pumps
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors