Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets
Descriptions
Lancashire Renewables Limited (LRL) was established for the operation and management of two central waste treatment facilities. LRL's key objectives are to receive, treat and transport contract waste in accordance with the targets and service requirements set out in the Service Level Agreement between the company and its majority shareholder, Lancashire County Council.
Each of LRL's two waste treatment facilities is designed to process and handle various municipal waste types arranged and supplied by Lancashire County Council and Blackpool Council. From April 2026, this means that source separated food waste from Lancashire's Households will be transported for processing into LRL's site based at Farington, Leyland (PR26 6TB).
Until 2014, LRL had an Anaerobic Digestion (AD) process in operation. The inputs came from residual 'black bin' household waste with organics separated via rotating trommels and metal separation. Waste was then fed into pre-treatment technologies before the organic soup produced was fed into the anaerobic digestion process. Gas produced from the anaerobic digestion process was pre-treated to remove hydrogen sulphide and other undesirable compounds before being fed into a gas storage vessel prior to use by the power generation infrastructure. The biomethane supplied two MWM TCG 2020K V12 engines with fuel to generate electricity which was then used on-site rather than exported into the grid.
The historical AD pre-treatment process was inefficient and expensive to run. As a result, the process ceased to operate in 2014 and the associated areas were put in a state of preservation and mothballed. It is estimated that the gas engines were only used for approximately 4000 hours prior to being decommissioned, having being installed circa 2010.
As household source-separated food waste collections in England are mandatory from April 2026, LRL is looking to recommence a new AD process at its site based at:
Lancashire Renewables Limited
Farington Waste Recovery Park
Sustainability Way
Leyland
PR26 6TB
To facilitate this, 2 no. gas engines / gensets are required to be brought back into operational service at LRL's Leyland site. Therefore, the contract will include offsite initial refurbishment, delivery back to site, installation and testing, followed by ongoing service and maintenance. It is likely that the initial refurbishment and install back on site of the two gensets must be completed by 01/04/2026.
It is possible that the same works may be undertaken, and hence the contract could require an additional 2 no. gas engines / gensets of the same manufacturer and model at LRL's Thornton facility. It is therefore likely that the contract will include provision for this, although it is to be decided at a later date whether this will be exercised.
Timeline
Pretender :
Not Identified
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
50531200 - Gas appliance maintenance services
Keywords
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors