Closed
Installation of 3 new boilers to replace the old boilers.
Descriptions
The boiler system in the RHA operates on a five boiler chain system. Two of these five boilers were replaced in 2017. The aim is to replace the remaining three boilers, that are now over 10 years old, with more cost effective, energy efficient models that will reduce energy costs and the carbon footprint of the RHA.The list of work needed to be carried out.•Replace 3no. gas boilers. •Install Quinta Ace 115 Boilers. •Re-pipe boilers to suit existing pipe work. •Commission boilers on completion. •Remove old boilers and waste from site. •Hand On/Off control from BMS only.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45331110 - Boiler installation work
50531100 - Repair and maintenance services of boilers
44621220 - Central-heating boilers
Keywords
central-heating boilers
hydronic boilers
boiler vessels
high-efficiency boilers
combi boilers
steam boilers
condensing boilers
residential boilers
industrial boiler units
boiler systems
boiler installation
boiler room setup
boiler pipe connection
boiler mounting
boiler pressure test
firetube cleaning
burner calibration
safety valve replacement
boiler gasket renewal
boiler shell inspection
heat exchanger servicing
steam line repair
burner control check
boiler tube retubing
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors