Closed

Marine Civils Detailed Design and Costs, Canner Slipway, Newlyn Harbour

Descriptions

Newlyn Pier and Harbour Commissioners is seeking to secure the services of a suitably qualified marine civil engineering company to produced detailed designs and costs and on to RIBA Stage 6 equivalent for a small, new quayside area within the harbour (approximately 120m of piling enclosing an area of 2,250m2 in a tidal corner of the inner harbour). The deadline for responses is: 13:00, Wednesday 12th September 2018. Newlyn is the largest fishing port in England by fleet and landings. It is located near Penzance in Mounts Bay, South West Cornwall. This Trust Port has a long term programme of development and expansion already underway. These plans address a longstanding shortage of good quality workspace in Newlyn, and quayside workspace in Cornwall, with the construction of industrial workshops, marine engineering infrastructure, food processing facilities and office space. This contract, along with Lot 5, relates to the "Canner Slipway" project within this programme which is part of the regeneration of the centre of the harbour estate and town. The Canner Slipway plans are for six to eight sheds of 120m2 on an expanded area of reclaimed quayside with tidal access. The buildings will be steel portal frames suitable for housing marine engineering and fishing operations with the height to accommodate mezzanine offices/storage or gantry crane systems. The current estimate for Canner Slipway, both marine civils and sheds, is £2.5m. Note: the funding source specifies that all buildings should achieve BREEAM excellence and a BREEAM Assessor is in the process of being procured separately to cover all three projects being undertaken (Canner Slipway, New Strand and Canner Car Park) to building certification stage and establish what this requirement will mean for the Canner Slipway element. This project, along with the two others in the programme, Canner Slipway and Canner Car Park are being funded by the Newlyn Pier and Harbour Commissioners, supported by a grant from the European Regional Development Fund (ERDF) under the ESIF Growth Programme for England 2014 to 2020 with the overall cost of all three elements of the scheme estimated at £6,146,308. Initial designs and cost estimates are available along with site investigations from the immediate area. The timelines for completion of the design and costs work are fairly challenging and we are looking for suppliers who can complete this element by mid October. The overall build programme runs through to 2021.

Timeline

Published Date :

28th Aug 2018 7 years ago

Deadline :

12th Sep 2018 7 years ago

Contract Start :

21st Sep 2018

Contract End :

25th Jun 2021

Tender Regions

UK

Keywords

architectural services

building engineering

technical design

construction consultancy

structural engineering

inspection services

surveying

planning consultancy

civil engineering

facility design

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

CompetitiveQuotationNonOJEU

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

CONTRACT

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors