Descriptions
It is proposed that the Multi-Party Framework will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £20 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £2 - £20m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procurement and Construction (EPC) models. • The default approach will be that equipment supply (transformers and switchgear etc.) will be in the scope of projects. Free issue of equipment will be limited to those projects for which NIEN have equipment ordered.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45232220 - Substation construction work
Keywords
substation construction
electrical substation build
switchgear facility erection
transformer compound construction
utility energy hub build
grid substation infrastructure
power distribution centre
high-voltage installation
substation yard build
electrical switchyard construction
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors