North Acton to Hanger Lane Cutting Remedial Work

Descriptions

Transport for London (TfL) has identified that cuttings CTS 7 and CTS 8 between North Acton and Hanger Lane require remedial works to stabilise the cutting. The combined length of the cuttings is approximately 1100m. The assets are susceptible to pore pressure levels (the pressure of groundwater in the soil or rock) and displacements and are considered a high risk. Due to the increased number of prolonged rainfall events over the recent years, soil pore pressure build up has become more common and the asset is at greater risk of failure. In 2017, TfL Engineering produced a detailed design for remediating the asset which consisted of; Discrete Bored Piles Discrete H-Piles King Post Wall Asset drainage Re-grading After the detailed design was completed, the business decision was to pause the project due to funding constraints faced by the business. Due to the criticality of this asset and the continued deterioration of the cutting, the project has been reinitiated.

Timeline

Published Date :

9th May 2025 Yesterday

Deadline :

29th Jul 2025 in a 2 months

Contract Start :

1st Feb 2026

Contract End :

30th Mar 2029

Tender Regions

Tender Lot Details

1 Tender Lot

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors