Closed
Phase 1 Habitat Survey
Descriptions
The scope of the specification is to define ecological survey work scope in support of the Statutory Planning application. This will involve an opening up meeting with the Project Environmental Manager and SO representative to confirm areas to be included in site walkdown, to carry out a supervised site walkdown of the Project site at Sellafield and produce a Phase 1 Habitat Survey Report that identifies recommendations for further ecological survey work and/or mitigation required to enable the development of the area
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71250000 - Architectural, engineering and surveying services
71313000 - Environmental engineering consultancy services
71355000 - Surveying services
71510000 - Site-investigation services
Keywords
building survey
land surveying
boundary surveys
EIA consultancy
site measurement
viability study
A&E survey consultancy
architectural surveying
site impact assessment
feasibility evaluation
soil mechanics testing
terrain behavior study
topographical surveying
project EIA services
geotechnical analysis
project due diligence
surveying services
project assessment
survey-grade mapping
bedrock profiling
geodetic surveying
spatial data collection
feasibility analysis
advisory consultancy
stratigraphic sampling
structural mapping
structural survey
geochemical analysis
engineering surveys
economic analysis
stability testing
environmental impact consulting
groundwater condition evaluation
preliminary site diagnostics
technical feasibility study
project advisory services
construction EIA reporting
waste management consultancy
construction soil risk evaluation
laboratory soil classification
EIA documentation services
environmental planning engineering
project environmental evaluation
environmental systems design
water treatment engineering
combined architectural-engineering surveys
environmental compliance consulting
contaminant level surveys
site measurement services
pollution control consulting
groundwater table analysis
green infrastructure consulting
feasibility report preparation
environmental planning support
engineering survey services
construction environmental assessment
sustainability engineering
foundation feasibility testing
ecological risk assessment
environmental borelogging
ecological engineering advisory
ecological impact reviews
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :