Closed
QEII Dock — Caisson Gate Refurbishment
Descriptions
The following is the main scope of works of the whole project:— caisson works: major refurbishment and upgrade works to the spare caisson,— wear track: replacement of worn steel tracks located on the floor of the lock that the gate slides across,— outer sill: repair works to the damaged outer sill which causes excessive leakage affecting lock operational duration and success,— hauling/operating machinery: the hauling/operating machinery in use is the original 1954 equipment and in requirement of complete upgrade/replacement,— caisson removal/installation: caisson movements, installation and commissioning within lock possession duration.This is an operational lock entrance to a busy dock, which will need to be out of service for a minimal period while the works are completed.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45248100 - Canal locks construction work
Keywords
canal locks construction work
lock chamber build
canal lock installation
navigation lock civil works
lock gate erection
waterway lock system build
lock infrastructure installation
lock building works
canal lock structure
lock construction
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors