Closed
Ring Farms - Organic Manuare Pelleting Plant and MultiFuel Biomass System
Descriptions
The design, supply and comissioning of an organic manure processing plant to produce organic bagged pellets. The process requires heat and to support that a multifuel biomass (big bale) boiler is required to supply renewable heat designed to be comissioned and installed to that process. Refer to the RFTs attached.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
51500000 - Installation services of machinery and equipment
9332000 - Solar installation
51540000 - Installation services of special-purpose machinery and equipment
9321000 - Hot water
Keywords
hot water
thermal water
industrial heating
process heat
hot water supply
solar installation
PV system installation
solar panel setup
renewable installation
equipment installation
industrial systems setup
plant machinery fitting
equipment commissioning
assembly service
machinery positioning
operational machinery setup
mechanical installation services
heavy equipment integration
assembly infrastructure services
custom machine setup
niche equipment integration
bespoke device installation
process-specific machinery fitting
specialized tool setup
tailored production unit installation
application-specific equipment mounting
bespoke industrial machine fitting
custom automation setup
special-series equipment installation
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors