Closed
St Pancras Enhancement Project RIBA 2 Design and Operational Concept Feasibility Study
Descriptions
HS1 Ltd has the 30-year concession to own, operate and maintain High Speed 1 (HS1), the UK’s only high-speed railway, as well as the stations along the route. Project Requirement The end output of Project can be described as: An International Zone operation capable of handling and processing up to 5,000 passengers in a rolling 60-minute period and; An International Zone that has the appropriate facilities and operating model to accommodate at least one new international operator. In providing a RIBA2 design and operational concept that will achieve this output bidders are asked to focus on: The spatial, architectural and other design elements including: Overall capacity provision; Improved passenger flows; Access and egress; Historic Building impact; Fire and evacuation safety; Station security design standards (SIDOS); Maintenance; Location, size and potential rationalisation of station facilities (Toilets, Operator facilities)
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71320000 - Engineering design services
Keywords
project design advisory
conceptual engineering
engineering blueprint consultancy
multidisciplinary engineering planning
engineering drafting services
technical design solutions
engineering specification services
technical design services
system design engineering
engineering design consultancy
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :