Closed

Supply and manipulation of Boiler Tubes.

Descriptions

The supply of Complete Boiler Elements or individual tubes to the design of the boiler components currently installed. The bending of tube shall be in accordance with the requirements of BS EN 12952 and controlled to minimise distortion and/or thinning of the tube on the bend radius.All materials shall be manufactured and tested in accordance with PED 97/23/EC and BS EN 10216-2:2003 (seamless steel tubes for pressure purposes). All tube is seamless cold drawn precisions steel, manufactured and tested in accordance with BS 3059.

Timeline

Published Date :

30th May 2017 8 years ago

Deadline :

29th Jun 2017 8 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

heating pipes

pipe assemblies

fluid conduit

steam pipes

supply network

hot water conduits

transport pipework

underfloor heating tubes

industrial pipe systems

utility water piping

radiator supply tubes

water distribution lines

plumbing fittings

protective casing

threaded pipe units

pressurized steam tubing

industrial tubing

mechanical pipe components

high-temperature conduits

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk