Closed

Temporary Pedestrian Bridge

Descriptions

Mace Dragados require a temporary pedestrian footbridge at the HS2 Euston Station site in London. The required works are detailed within the attached Scope of Works and comprise the design, fabrication, and installation of the footbridge across the basement area of the former two towers site outside the existing Euston Station.

Phase 1 involves the installation of the footbridge to suit the existing ground level on pad foundations. The footbridge will then need to be taken down (and stored on site or removed) whilst the reduced level dig is completed to the required foundation level and then reinstalled on plunge columns.

Timeline

Published Date :

26th Aug 2025 4 months ago

Deadline :

3rd Sep 2025 4 months ago

Contract Start :

1st Jul 2026

Contract End :

3rd Jul 2031

CPV Codes

Keywords

footbridge construction

urban footpath span

light-span footbridge

footwalk superstructure

walkway span erection

pedestrian link structure

pedestrian crossing bridge

walkway infrastructure bridge

non vehicular bridge build

pedestrian overpass build

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Name :

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk