Open Closing in 1 months
The Provision of Temporary Structures at ReActon Circular Economy Hub for West London Waste Authority
Descriptions
Introduction West London Waste Authority (WLWA) is a statutory Waste Disposal Authority (WDA) established in 1986. WLWA is responsible for disposing of waste collected by the London Boroughs of Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond ....see more
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
cabins
portable units
mobile cabins
modular shelter
field cabins
portable cabins
modular metal components
metal framework assembly
steel assembly works
modular buildings
prefabricated cabins
metallic support build
iron structure fit-out
transportable buildings
relocatable structures
truss structure build
prefabricated metal erection
industrial frame erection
structural steel integration
steel skeleton construction
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :
Procurement Contact
Name :
Phone :
Email :
Possible bidding competitors
Possible bidding competitors