Closed
Tilbury Dual Function Lock Gates
Descriptions
The Port of Tilbury London Ltd (POTLL) the Employer and the Environment Agency (EA) as a joint venture are to replace the 3 sets of mitre gates at the Port of Tilbury Lock. By means of the addition of a removable 3.0 m high extension to the top of the outer gates, the outer gates shall serve as a flood defence barrier with a flood defence level of 7.0m AOD.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45246400 - Flood-prevention works
Keywords
flood-prevention works
storm surge barrier installation
anti-flood infrastructure
levee system build
floodgate construction
overflow management works
water containment projects
river flood control
drainage prevention systems
flood defence engineering
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors