Closed

Virunga Power — Lilondi EPC Procurement

Descriptions

The Lingatunda SHP is located on the Lilondi River, Ruvuma region, Tanzania. Virunga Power is lead developer through the project SPV, Lilondi Hydropower Ltd (LHL). LHL seeks a Contractor for the SHP, a 4.56 MWrated capacity run-of-the-river hydroelectric project. The Contractor scope of works will be project turnkey engineering, procurement, and construction, including:— design,— procurement and construction of civil and hydraulic structures (including, weir, intake structure, sand tank, surge tank, powerhouse, tailrace, medium voltage switchyard, etc.),— installation and commissioning of electromechanical equipment and— construction of 5 km 33 kV low voltage distribution line to national grid substation.Salient project features:— 5 m high vertical drop weir with no storage,— 717 m long GRP penstock with 1 100/1 000 mm diameter and 180 m long GRP low pressure pipe with 1 100 mm diam diameter,— 2 Pelton vertical axis turbines,— 8 300 m of access roads (2 000 m new and 6 300 m rehabilitated).

Timeline

Published Date :

30th Nov 2018 6 years ago

Deadline :

3rd Dec 2018 6 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

31121000 - Generating sets

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors