Awarded
Walking and Cycling Infrastructure Studies
Descriptions
WECA are investigating the feasibility of several walking and cycling corridor infrastructure schemes within the WECA region. The schemes have been identified through the Cycling and Walking Early Assessment Sifting Tool (EAST) as being eligible to proceed to Outline Business Case (OBC). South Gloucestershire Council is seeking to commission consultancy support to undertake feasibility studies and develop OBCs for two routes within the authority: •Lot 1 - Alveston Hill corridor OBC •Lot 2 - Yate Spur corridor OBC
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
architectural services
building engineering
technical design
construction consultancy
structural engineering
inspection services
surveying
planning consultancy
civil engineering
facility design
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors