Closed
Ground Investigations/Surveying
Descriptions
The scope of the investigation for the project comprises of: — shallow holes/pits to varying depth 0.15m, 1.0m, 2.0m; — SPT tests soil are to be carried out in all boreholes to confirm engineering rock (SPT 80); — laboratory and in situ tests are to be carried out on samples for the rock characterization; — 1 no. permanent wells are to be installed from which the groundwater level will be monitored/sampled starting from the pre-construction phase. The design of the well shall be the responsibility of the Environmental Scientist employed by Sellafield Ltd.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
core drilling
rock boring
probe boring
soil boring
test boring work
geotechnical surveys
test drilling work
subsurface testing
environmental drilling
water well test drilling
ground test drilling
geological boring
environmental boring
exploratory boring
geotechnical drilling
site boring services
borehole drilling
exploratory borehole
core sample drilling
subterranean boring
test shaft boring
exploratory drilling
subsurface investigation drilling
foundation testing drilling
site investigation drilling
exploratory test drilling
test drilling and boring work
ground investigation boring
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :